Stage One:
The first stage is a complete inspection, sanitation, and disassembly of the entire Urological system. |
Stage Two:
All composite and metal components, table shell, and other system components are repaired with any necessary machining or welding and then sent to the prep & paint area for sanding and custom painting process. *Custom paint colors and High gloss finish options available. |
Stage Three:
All painted components are returned to a staging bay where the careful reassembly process begins for OEM specification operability. |
Stage Four:
After the system is mechanical rebuilding and parts replacement is completed the system is fully assembled for a system compatibility pre-staging. At this point the system is fully tested and calibrated to Original Equipment Manufacturers (OEM) specifications. |